The conductor is aligning the switch so ELTX 7092 can be shoved onto its assigned track. Another railfan is also catching the action. OLD CNJ Station seen ahead of MA-2. The conductor is a very nice person and friendly to railfans. I have met him when railfanning here. |
Date:
1/11/2023 |
Location:
Bound Brook, NJ Map ![Show Bound Brook on a rail map](/images/map_us.gif) |
Views:
80 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Steve Coraggio |
Locomotives: Rolling Stock: |
Author: Steve Coraggio
|
![Aligning the Switch](/pictures\147484\DSC_0189.JPG) |
Picture Categories: Roster,RollingStock,Winter,Yard,Station,Track,Action |
This picture is part of album: MA-2 Delivers Covered Hopper ELTX 7092 to Bound Brook Yard, Then Departs. |