The buidling behind the excavator arm is the FRVT engine house, complete with a caboose sitting in front. The towers of the Route 3A lift bridge can be seen above FRVT 102. |
Date:
10/22/2020 |
Location:
Quincy, MA Map  |
Views:
190 |
Collection Of:

Jay Epstein |
Locomotives: |
Author: Jay Epstein
|
 |
Picture Categories: Action |
This picture is part of album: Southside of Boston Railfanning |