The top track is Labish Siding. The center track is the main. The bottom track is the PNWR exchange lead. |
Date:
9/3/2009 |
Location:
Salem, OR Map ![Show Salem on a rail map](/images/map_us.gif) |
Views:
98 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Keith Owen |
|
Author: Keith Owen
|
![UP Tracks](/pictures\9532\LabishFromHelicopter09-03-09%201.jpg) |
Picture Categories: Track |
This picture is part of album: Portland to Salem |